3a51305343
- six REST endpoints (auth/request_otp, verify_otp, refresh, logout, me, me/select_role) wrapping the existing JWE/TOTP/RBAC engine - usr.UserSessions with refresh-token rotation + stolen-token (replay) detection → revoke-all + 401; logout rotates the security stamp - users extended: gender, national_id (enc, NULL until KYC), shahkar_verified_at (auto-reset on phone change), phone_hash UNIQUE, is_active, deleted_at + soft-delete filter; phone/email/national_id encrypted at rest via IFieldEncryptor value converter - user_roles grant/revoke audit trail + global revoked filter; 7 roles seeded; admin sub-roles never self-assignable (403) - ISmsSender seam (mock logs the OTP code) replaces the TODO log lines - OperationResult/BaseController learned enveloped 401/403 - auth knobs as platform_configs rows (resend/attempts/session TTL) - migration IdentitySessionsAndUserExtensions applied to the dev DB - 24 new tests incl. Baya.Test.Api (WebApplicationFactory over SQLite); 47 total green, zero new build warnings; swagger snapshot + contract (identity-auth.md), handoff, report, mocks-registry updated Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
Phase reports — template
Every phase writes a report here when it finishes (operating-rules §7, Definition of Done). The report is the durable answer to "what did this phase do, what can I test now, and what's still fake?" — saved to a file, not left in chat.
File name: backend-phase-N-report.md or frontend-phase-N-bM-report.md.
# <Backend|Frontend> Phase N — <Title> — Report (<YYYY-MM-DD>)
## What was built
- Bullet list of concrete deliverables (entities/migrations/endpoints, or screens/services/components).
## What is now testable (and exactly how)
- Step-by-step for a human: e.g. "Swagger → POST /api/v1/auth/otp/request with {phone} → 200; the OTP is
logged to the console; POST /api/v1/auth/otp/verify with that code → returns access+refresh tokens."
- For the frontend: which screen, which route, what to click, expected result, how mock data shows up.
## What is mocked / waiting on a real service
- Each seam touched: interface + file, what's faked, and a link to its entry in `mocks-registry.md`.
## Contracts
- Produced (backend): which `contracts/domains/*.md` + openapi snapshot.
- Consumed (frontend): which contract/version; any request filed in `frontend/requests/for-backend.md`.
## Docs updated
- Which CLAUDE.md / product doc / conventions were updated and why.
## Follow-ups for later phases
- Anything intentionally deferred, with the phase that should pick it up.